Choose the recovery population before the target Historical proposal / October 2026 REQUEST Reconcile which data and functions require recovery before adopting targets. SOURCES A selected prepared recovery decision, operating-scope confirmation and preserved references to earlier database restore/catalog checks. PREPARED RESULT Confirmed historical test content was separated from required company records, unique configuration, original encryption keys and service/support duties. Exclusion of historical test contents from mandatory restore was proposed; existing backup settings were retained. Existing database restore evidence was reused without turning it into a full-service RTO or achieved RPO. REMAINING DECISION The responsible business owner still needed to adopt or correct the recovery population, minimum service function and targets. Changed technical dependencies needed their own review. Future customer dependencies required reassessment. No deletion, backup disabling, key rotation or new production test was authorized. This is an anonymized summary of founder-assisted preparation, not an adopted target, measured capability, customer promise or automated Hetalos run.